Aderhold Hall portico roof replacement

Starting Tuesday, May 19, Aderhold Hall’s portico on its northern face will have its roof replaced. Scaffolding will be installed to provide cover for individuals entering the first floor of Aderhold, and the stairs to the second-floor entrance will be closed.

Work is anticipated to continue from May 19-29. A dumpster will be present along with a lift, though the walkway should be clear from the lower parking lot to the first-floor entrance.